Yards Creek Pumped Storage

The Yards Creek Pumped Storage Project - Upper Reservoir Shutoff Gate Project showcases Linita Design & Manufacturing's expertise in the design, engineering, fabrication, and delivery of custom water control gates and related equipment for large infrastructure projects.

For this project, Linita was responsible for the design, engineering, fabrication, and delivery of the Upper Reservoir Bulkheads, measuring 11' x 7' and weighing 8,000 lbs each, along with their guides. The project also included two Fixed-Wheel Roller Gates measuring 12' x 30' and weighing 66,000 lbs each, bulkhead storage, a lifting beam, and two 75-ton Roller Gate Hoists.

This project demonstrates Linita's manufacturing capabilities across every stage of production, from engineering and fabrication through delivery. By providing complete gate systems and supporting components, Linita continues to deliver custom water control gate solutions for complex infrastructure applications.

 

Project Highlights

Project: Yards Creek Pumped Storage - Upper Reservoir Shutoff Gate Project

Scope of Work:

  • Design
  • Engineering
  • Fabrication
  • Delivery
  • Upper Reservoir Bulkheads
  • Fixed-Wheel Roller Gates
  • Bulkhead Storage
  • Lifting Beam
  • Two 75-ton Roller Gate Hoists