Gates |
| Whether you need a new project and overhaul or an upgrade, Linita can design, build, and install all your gate requirements. Our capacity has no limits as we can manufacture the smallest and the largest gates measuring to any size or weight. |
| We can assess your site and make recommendations, or follow your own requirements. Please feel free to contact us with any inquiries. |
| The following are some examples of our projects in the past. |
Gate Types:
- Sluice Gate
- Draftube Swing Gate
- Intake Gate
- Wheel, Bulkhead Gate
- Stoplog Gate
- Tainter/Radial
- Tainter Gate
- Spillway Gate
- Roller Gate, miter, lock, etc
|
|
|
| Project: |
Ears Fall Hydro Project |
|
|
| Contract Awarded: |
January 2006 |
| Completed: |
May 2008 |
| Owner: |
Ontario Power Generation |
| General Contractor: |
SNC Lavalin, Montreal, QC |
|
 |
|
|
|
|
| Project: |
Springbank Project |
| Design & build (6) tainter (radial) gates c/w new guides & sills Gates were assembled in our shop c/w arms, then disassembled & shiped to site. |
| Contract Awarded: |
October 2004 |
| Completed: |
September 2007 |
| Owner: |
City London, Ontario |
| General Contractor: |
Linita Design & Manufacturing |
|
|
|
|
| Project: |
Duncairn Dam |
|
|
| Spillway Head |
21 feet |
| Contract Awarded: |
January 2004 |
| Completed: |
January 2006 |
| Owner: |
Canadian Government |
| General Contractor: |
Westridge Construction |
|
 |
|
|
| Project: |
Rutherford Creek |
|
|
| Contract Awarded: |
March 2003 |
| Completed: |
Dec 2004 |
| Owner: |
Innergex |
| General Contractor: |
Kiewit Construction BC |
|
 |
|
|
|
|
| Project: |
Allegan Hydro
Project-
Allegan Michigan U.S.A. |
| Design & build (6) tainter (radial) gates c/w new guides & sills Gates were assembled in our shop c/w arms, then disassembled & shiped to site. |
| Contract Awarded: |
April '99. |
| Completed: |
September ‘99 |
|
|
|
|
|
|
| Project: |
Portage Dam at French River, ON |
| Design, Supply & Install Three Water control Gates
c/w Hoist Bridges & Wire Rope Hoist. |
| Head |
45 feet |
| Contract Awarded: |
March 1993 |
|
|
|
|
| |